Morticia
Well-known member
- Joined
- May 22, 2008
- Messages
- 17,771
- Reaction score
- 685
Guy came yesterday to move furniture for carpet installation. 5 minutes after he left installer called to let me know the heat has to be turned on and that none of the carpet has been cut yet, so that will slow him down. He asks if he's supposed to move the furniture? I say the guy has just been here and moved it all. Installer says, 'He doesn't know where I want to start!'
I think, 'you guys should really talk to each other!'
Sure enough, they're here, and the mover moved the wrong rooms so they now have to move everything back into the original rooms along with moving all the furniture in the rooms the installer wants to do first. It's like the 3 Stooges here this morning...
I've told hubs to stay out of it. We paid to have everything done and we're not doing the parts we paid for ourselves.
I think, 'you guys should really talk to each other!'
Sure enough, they're here, and the mover moved the wrong rooms so they now have to move everything back into the original rooms along with moving all the furniture in the rooms the installer wants to do first. It's like the 3 Stooges here this morning...
I've told hubs to stay out of it. We paid to have everything done and we're not doing the parts we paid for ourselves.